What a proof consultant actually checks
Proof checking, ICE and ILDC are not box-ticking. A good independent check finds the problems that would otherwise surface on site.
On major tunnel, metro and highway projects the designer's work is reviewed by an independent engineer — called a proof consultant, an Independent Checking Engineer (ICE) or an Independent Lead Design Checker (ILDC), depending on the contract. Bouw acts in all three roles. Here is what an independent check should cover.
Design basis first
Before looking at a single calculation, we check the design basis report: the codes adopted, design life, load combinations, ground parameters, groundwater assumptions and material properties. Most significant design errors trace back to an unsuitable assumption here rather than an arithmetic slip.
Ground model and parameters
For underground works, the design is only as good as the geotechnical interpretation. We compare the adopted parameters with the investigation data, check how variability and weak zones have been treated, and confirm that rock-mass classification and support classes line up with what the excavation is likely to meet.
Independent analysis
Where it matters, we do not just read the designer's model — we build our own simplified or parallel checks: convergence-confinement analysis, independent finite element runs, beam-spring models for linings, or hand calculations to bound the result. Agreement within reason builds confidence; a large difference points to where the review should dig.
Constructability and sequence
Many failures happen during construction, not in service. We check excavation sequences, temporary support, TBM launching and retrieval arrangements, dewatering, and the stages at which the structure is most vulnerable.
Monitoring and trigger levels
A design for underground works is incomplete without an instrumentation plan, trigger levels and agreed actions when they are reached. We check that these exist, are realistic and are tied to the design assumptions.
Clear, actionable comments
Finally, an independent check is only useful if its comments are specific, referenced and prioritised, so the designer can close them quickly and approvals are not delayed.